CRO PlatformAI-Native CRO OS
Toggle navigationMenu

Roadmap

Phase 1 → Phase 4 build plan

Every workstream that has shipped, is in flight, is planned, or is blocked. One source of truth for "what are we actually building?" — sourced from apps/web/src/data/roadmap.ts.

Roadmap headline tiles

Phases

4

Done

9

In progress

0

Planned

8

Blocked

1

Phases

Phase 4 — Biostats and TLF

Close the loop with statistical analysis planning and table/listing/figure generation. Highest-stakes work — gated on a double-programming sign-off.

ETA 2027-Q1planned
WorkstreamStatusShipped

Biostats SAP authoring

agents/22-sap-drafting drafts the Statistical Analysis Plan with cited references back to the protocol, ICH E9, and CDISC standards.

Agents: 22-sap-drafting

planned

TLF generation with double-programming gate

agents/23-tlf-primary and agents/24-tlf-validator produce two independently programmed copies. Promotion to live requires a numeric-equality gate plus a human signature — the double-programming gate.

Agents: 23-tlf-primary, 24-tlf-validator

planned