CRO PlatformAI-Native CRO OS
Toggle navigationMenu

Roadmap

Phase 1 → Phase 4 build plan

Every workstream that has shipped, is in flight, is planned, or is blocked. One source of truth for "what are we actually building?" — sourced from apps/web/src/data/roadmap.ts.

Roadmap headline tiles

Phases

4

Done

9

In progress

0

Planned

8

Blocked

1

Phases

Phase 2 — Operations cluster

Light up the agents that touch day-to-day trial operations: data management, feasibility, and the regulated dictionaries that everything downstream depends on.

ETA 2026-Q3planned
WorkstreamStatusShipped

Data Management cluster

agents/05-edc-design, agents/06-data-cleaning, agents/07-database-lock — supervised authoring of CRFs, edit checks, and the lock package.

Agents: 05-edc-design, 06-data-cleaning, 07-database-lock

planned

Feasibility cluster

agents/01-site-feasibility, agents/02-country-strategy, agents/03-enrollment-forecast — proposed site lists, country mixes, and enrollment curves with cited evidence.

Agents: 01-site-feasibility, 02-country-strategy, 03-enrollment-forecast

planned

Phase 3 — Safety, protocol, RBQM, medical writing

Add the agents that drive medical and safety decisions, plus the protocol intake and the risk-based quality management wave. AI never makes the causality call.

ETA 2026-Q4planned
WorkstreamStatusShipped

Safety / Pharmacovigilance cluster

agents/15-safety-intake, agents/16-narrative-drafting, agents/17-signal-detection. Causality assessment remains a human-only act — enforced architecturally in packages/policy.

Agents: 15-safety-intake, 16-narrative-drafting, 17-signal-detection

planned

Protocol intake agent

agents/00-protocol-intake — parses sponsor-supplied protocols, extracts structured study parameters, and seeds the rest of the agent cluster.

Agents: 00-protocol-intake

planned

RBQM wave

agents/12-risk-assessment, agents/13-quality-tolerance-limits, agents/14-central-monitoring — risk register, QTL drift detection, central-monitoring triage.

Agents: 12-risk-assessment, 13-quality-tolerance-limits, 14-central-monitoring

planned

Medical writing cluster

agents/20-csr-drafting, agents/21-publication-support — citation-grounded section drafting for CSRs and manuscripts. A2 supervised across the board.

Agents: 20-csr-drafting, 21-publication-support

planned

Phase 4 — Biostats and TLF

Close the loop with statistical analysis planning and table/listing/figure generation. Highest-stakes work — gated on a double-programming sign-off.

ETA 2027-Q1planned
WorkstreamStatusShipped

Biostats SAP authoring

agents/22-sap-drafting drafts the Statistical Analysis Plan with cited references back to the protocol, ICH E9, and CDISC standards.

Agents: 22-sap-drafting

planned

TLF generation with double-programming gate

agents/23-tlf-primary and agents/24-tlf-validator produce two independently programmed copies. Promotion to live requires a numeric-equality gate plus a human signature — the double-programming gate.

Agents: 23-tlf-primary, 24-tlf-validator

planned